ROESSLER
Construction & Contracting, Inc.
Design/Build, General Construction and Construction Management that stands the test of time.

Scroll Down

Completed Projects

CIMIC Mosque Addition & Remodel

This project is for the remodeling and new additions for the CIMIC in Urbana, Illinois.  The project is being addressed in (5) phases starting with phase one for the construction of a new east entrance and then continuing with interior remodeling and finishing with the construction of a new west entrance. Vender Access  

New Dental Clinic – 2014

Design Build Project By Roessler Construction & Contracting, Inc. for An Complete Renovation and Update of a Existing Dental Clinic  

New Fiberglass Mezzanine For Acid Storage Room – 2013 / 2014

Design build project for installation of a new fiberglass mezzanine for access to acid storage tanks. Scope of work includes engineered drawings, demolition, structural fiberglass framing, fiberglass grating / handrail systems and fiberglass ladder. View project drawings Acid Storage Room Mezzanine Sheet A1 Acid Storage Room Mezzanine Sheet A2 Acid Storage Room Mezzanine Sheet A3

Willard Airport Electrical Vault – 2013

Construction of new electrical vault building for Willard Airport in Champaign, Illinois. Scope of work included excavation, concrete, masonry, steel, roofing, grating systems and finishes

Peoples Gas Replace Boiler #8 – 2013

Reboiler #8 is a tri-ethylene glycol reboiler unit which is utilized to remove water from natural gas that is withdrawn from the underground storage.  This project required the removal of the existing reboiler unit / foundation system and replacement of a new reboiler and foundation system along with other mechanical upgrade work. Scope of work… Continue Reading

Peoples Gas – Pretreatment Skid Installation – 2013

The Pre-Treatment Skid is a solid absorbent gas pre-treatment unit designed to treat pipeline quality natural gas to reduce the content of water and carbon dioxide (CO2) in the gas.  This project required the removal of the existing pre-treatment skid / foundation system and installation of a new pre-treatment skid / foundation system along with… Continue Reading

Integrys Manlove Field Operation Center Project

New Control Building For Integrys “Peoples Gas” in Fisher Illinois.  Roessler Construction & Contracting Is The General Contractor For This Important Project For Integrys.  

Paxton First United Methodist Church Bell Tower – 2011 / 2012

Paxton Bell Tower 2011 / 2012 Roessler Construction & Contracting was the design builder for this project it consisted of removing the upper section of the tower due to structural issues.  The upper tower was removed and then reconstructed, three existing wood floor systems were replaced with structural steel, metal deck and EPDM roofing for structural purposes and to… Continue Reading

People Gas – New Warehouse – 2012 / 2013

Manlove Field Warehouse 2012 / 2013     This is a new warehouse addition that Roessler Construction & Contracting designed and built for Integrys / Peoples Gas.  The project turned out to be a great project and one that set RCC off now with one of our best customers Integrys, one of the largest utility companies in the USA.  We also… Continue Reading

Carmike Theater – 2012 / 2013

Contractor responsible for structural steel installation for the new Champaign theater. Scope of work included structural steel, steel joist, metal deck, metal stairs, handrail and miscellaneous steel erection.  

Your next project starts here.

Planning a new project? This time, set your sights higher. We’ll treat your project as if your goals were our own. And we’ll treat you like family.

Roessler Construction & Contracting, Inc.
P.O. Box 17187
Urbana, IL 61803

Phone: (217) 202-3357
Kenny@roesslerconstruction.com