Peoples Gas – Pretreatment Skid Installation – 2013

The Pre-Treatment Skid is a solid absorbent gas pre-treatment unit designed to treat pipeline quality natural gas to reduce the content of water and carbon dioxide (CO2) in the gas.  This project required the removal of the existing pre-treatment skid / foundation system and installation of a new pre-treatment skid / foundation system along with other mechanical upgrade work.  This was a very aggressive project and required the new skid to be constructed off site while demolition and new foundation work was being addressed.  Once the new foundation was completed the new skid required a large scale move from fabrication location to new foundation location.  All work was completed in a two month period.

Scope of work included ground protection, demolition, excavation, site improvements, concrete foundations, structural steel, stairs, waterproofing, painting, piping / plumbing work, electrical systems and telecom / fiber optic work.

This entry was posted in Completed Projects. Bookmark the permalink. Both comments and trackbacks are currently closed.

Your next project starts here.

Planning a new project? This time, set your sights higher. We’ll treat your project as if your goals were our own. And we’ll treat you like family.

Roessler Construction & Contracting, Inc.
P.O. Box 17187
Urbana, IL 61803

Phone: (217) 202-3357
Kenny@roesslerconstruction.com


Copyright ©